Back Fill & Countertops

The orange construction fence came down today for the builder to level out our lot and backfill with dirt. Meanwhile, the granite was installed in the bathrooms and kitchen.

Also, the lender said we should go ahead and lock in a rate. He said we can do that tomorrow.

Lunch photos.








Afternoon photos.
























Posted by Jerry Markham at 4:47 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: countertops

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My photo
Jerry Markham
View my complete profile

Blog Archive

  • ▼  2015 (123)
    • ►  October (2)
    • ►  September (21)
    • ▼  August (20)
      • Tile Part 2 - Some Grout
      • Tile Part 1 - Ceramic Tile
      • Back Fill & Countertops
      • A/C Pad and Grading Soil
      • Notice to Vacate Submitted
      • Flatwork - Day #4
      • Flatwork - Day #3
      • Flatwork - Day #2
      • Flatwork - Day #1
      • Primer and Interior Paint
      • Interior Trim
      • Cabinet Staining and Exterior Paint
      • Flashing Finishing
      • Curb Removal
      • Garage Door & Curb Cutting for Removal
      • Cabinet Installation and Underground Electrical
      • Address Brick
      • Gas Line Installation
      • Another Electrical/Drywall Error - Walls Textured
      • Electrical/Drywall Error
    • ►  July (17)
    • ►  June (10)
    • ►  May (17)
    • ►  April (9)
    • ►  March (8)
    • ►  February (7)
    • ►  January (12)
  • ►  2014 (17)
    • ►  December (2)
    • ►  October (4)
    • ►  September (11)
Awesome Inc. theme. Powered by Blogger.