Wednesday, September 9, 2015

Delayed Tile Work Explained

Apparently something in the master shower is not level. That is why the tilers have not returned. Meanwhile the GC has been out of town and not available to do anything to move things along. When I talked to him on the phone he said he is waiting for electricity to be turned on. That will be followed by wood flooring. He is still optimistic about finishing up 3rd week of this month.

In the evening I took the family over to Lowes Home Improvement to look at stuff for the house.

No comments:

Post a Comment