Showing posts with label rebar. Show all posts
Showing posts with label rebar. Show all posts

Monday, August 17, 2015

Flatwork - Day #2

Sand and rebar has been placed for our sidewalk and driveway. Additionally, the master bath cabinet has been replaced.









Friday, June 19, 2015

Foundation Repair - Part 2 (Concrete)

At lunch today I saw wet concrete recently poured, patching up the holes from the plumbing relocation.




I also noticed that the tubs were drained of the water that has been sitting for weeks and weeks. I guess they passed the pressure inspection.



Additionally, a vapor barrier has been added to the seat for the shower.

Monday, June 15, 2015

Foundation Repair - Part 1 (Rebar)

When I showed up today at the house the GC was there along with an inspector who was very busy and focused on his work.

I didn't want to hinder their work so I just took a few photos and got out of there.

I noticed 3 things.

Most importantly, the two holes from the botched plumbing placement, have been reinforced with rebar.

Next, I saw two pallets full of concrete mix that I can only assume will be for our sidewalk and driveway.

Last, there were a couple of metal rails sitting in front of the garage. Maybe for the driveway also. I don't know about that.