Friday, June 19, 2015

Foundation Repair - Part 2 (Concrete)

At lunch today I saw wet concrete recently poured, patching up the holes from the plumbing relocation.




I also noticed that the tubs were drained of the water that has been sitting for weeks and weeks. I guess they passed the pressure inspection.



Additionally, a vapor barrier has been added to the seat for the shower.

No comments:

Post a Comment