At lunch today I saw wet concrete recently poured, patching up the holes from the plumbing relocation.
I also noticed that the tubs were drained of the water that has been sitting for weeks and weeks. I guess they passed the pressure inspection.
Additionally, a vapor barrier has been added to the seat for the shower.
No comments:
Post a Comment