Let's Get a House

Monday, June 8, 2015

Rough Electrical

These photos were taken during and after the work was done. I took about 150 photos to document as much as possible for future reference.





























Posted by Jerry Markham at 10:43 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: electrical

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My photo
Jerry Markham
View my complete profile

Blog Archive

  • ▼  2015 (123)
    • ►  October (2)
    • ►  September (21)
    • ►  August (20)
    • ►  July (17)
    • ▼  June (10)
      • Follow-Up Work
      • Markup Following Inspection
      • Foundation Repair - Part 2 (Concrete)
      • Ventilated Attic Panels
      • Foundation Repair - Part 1 (Rebar)
      • Caulk Gun Delivered Foam Insulation
      • Bricks and Drywall Delivered
      • Rough Electrical
      • HVAC Day #2
      • HVAC Day #1
    • ►  May (17)
    • ►  April (9)
    • ►  March (8)
    • ►  February (7)
    • ►  January (12)
  • ►  2014 (17)
    • ►  December (2)
    • ►  October (4)
    • ►  September (11)
Awesome Inc. theme. Powered by Blogger.