Tonight we went to Lowe's and bought a fridge, storm door, garage door opener, ladder and a garden wagon. They will deliver it all Monday afternoon.
Blue Hawk Garden Cart
Chamberlain 0.5-HP MyQ-Enabled Premium Chain Drive Garage Door Opener
Larson-First-Impression-Bronze Storm Door
Samsung 30.4-cu ft French Door Refrigerator with Single Ice Maker (Stainless Steel) ENERGY STAR
Werner 3-Step Steel Step Ladder
They gave us 10% off all first time purchases. Then another 10% off the floor model fridge. It was already on sale. We saved like $1500 on the refrigerator alone.
Thursday, October 1, 2015
Repaired Floor and It's Ours
I got to the house early today to let the GC in. I was early so I went inside to take some photos. The painter showed up and was looking at the botched floor. I asked if he was the painter (I knew he was). He confirmed. I pointed out the bad floor spots and paint on the floor. He resisted taking ownership of the problem. In fact the paint drips on the floor he insisted wasn't paint. I realized that I was arguing with a tree stump. He left.
Here are some photos of the crap job he did on our wood floor. The moron cleaned up paint with paint thinner on the wood finish.
The GC finally arrived and I told him everything and left my house key with him. I told him that they had better get it perfect because I was going to scrutinize their corrections. A few corrections that they managed to complete were moving the shrubs away from the foundation, a mailbox, and completing the electrical in the bathroom (overhead light and switch installation in master bath and correct routing of fan switches.
Meanwhile back at work, I organized my 3" binder of house paperwork that I've been keeping for the passed year since we started looking at houses.
I got the gas, electricity, water and trash transferred into my name then drove over to see if the floor was fixed. I couldn't believe it. They pulled it off. More likely they buffed it off. When I got there the GC and the original GC that we started with were in front of the house to greet me. I saw the painter and two helpers on their hands and knees scrubbing the floor. You can bet your behind someone was trying to keep their job and their paycheck. I walked through the house and got down on all fours and found that it was satisfying.
With that, we all shook hands and I gave them the final approval. Our home is finished.
I called the movers and settled on a move date for Monday.
Here are some photos of the crap job he did on our wood floor. The moron cleaned up paint with paint thinner on the wood finish.
The GC finally arrived and I told him everything and left my house key with him. I told him that they had better get it perfect because I was going to scrutinize their corrections. A few corrections that they managed to complete were moving the shrubs away from the foundation, a mailbox, and completing the electrical in the bathroom (overhead light and switch installation in master bath and correct routing of fan switches.
Meanwhile back at work, I organized my 3" binder of house paperwork that I've been keeping for the passed year since we started looking at houses.
I got the gas, electricity, water and trash transferred into my name then drove over to see if the floor was fixed. I couldn't believe it. They pulled it off. More likely they buffed it off. When I got there the GC and the original GC that we started with were in front of the house to greet me. I saw the painter and two helpers on their hands and knees scrubbing the floor. You can bet your behind someone was trying to keep their job and their paycheck. I walked through the house and got down on all fours and found that it was satisfying.
With that, we all shook hands and I gave them the final approval. Our home is finished.
I called the movers and settled on a move date for Monday.
Wednesday, September 30, 2015
Final Walkthrough, Closing, Lost Keys, and Poor Workmanship
I picked up a cashier's check from the bank at lunch today before taking my wife over to the house to meet the builder and the realtor.
We did our final walkthrough today at 1pm. There were a handful of tiny holes not filled or painted. Most important, the floor had a haze that we thought was just a poor cleaning job. They were going to let the floor go as it was but I put my foot down and said it had to bee fresh cleaned before we move in. Then they told us they had to fire the cleaning crew for poor work. That further backed up my request for them to get it cleaned up. Everyone agreed.
We went over to the next town to close and all went well. We were given two surveys to fill out. One for the finance company and one for the builder. We scored everything except for a portion of the builder survey where I had nothing positive to say so I left it with the statement 'Refuse' (to do survey). As we were leaving, we got a call from the sales rep who congratulated us and immediately asked about the survey. I simply told her that we only did part of the survey and left part of it blank because we were happier in some areas than others.
Once we got into town, the sales rep called to tell me that the keys to our new house have already been lost somewhere between the builder and the title company. We were told a locksmith was on the way to rekey the locks and that they could put a lockbox on the house temporarily. I said no, we are coming to the house and will wait to get our 'actual' keys because we just closed on the house.
We went to the house to see hoe the touch ups went while we are closing. They did a few and missed a few. The the bomb was dropped on us. The wood floor doesn't have a haze from a dirty rag or something. It has a haze because the sheen has been removed by a chemical agent that the dumb friggin painter used to clean up after doing a lousy job to begin with.
After the bad news was given to us, the guy from the flooring company showed up to discuss things they could try to do to resolve it. While the builder and flooring guy talked, I crawled around on the floor and found white paint speckles around all of the door ways and overspray dust in corners and many of the baseboards. I told the builder that those guys have to come back and clean everything perfect. Meanwhile, the locksmith came out and rekeyed all of the doors and we were given 4 keys. The builder told us not to use our keys until he is done working because the way the locks are set up. Our keys will void his if we use them. He was going to get an additional spec key from the sales rep but she had already gone for the day. He gave us his and said he would just go get the other one in the morning.
There wasn't more we could do but finally go get something to eat. It was eating me up all evening. I called the sales rep to tell her about the floor. The first thing she told me is that this is where she comes in and that's why we shouldn't give her a bad survey. I scolded her immediately that I never said anything about giving her a bad survey; that I only ever indicated that I graded only in the areas that we were happiest. She said that if they can't get it resolved, that it would become a poor workmanship claim and that the floor would have to be replaced if we aren't happy with the end result.
After dinner we went to finance our refrigerator but we are not happy with the limit readily available to us. So, we just decided that we will pay cash but better wait until they get the floor issue resolved. We did get some insecticide, however.
My wife and son went home and I went to the house to spray for pests, even though it was already dark. The spec key didn't work. That figures, since the locks were rekeyed. So, I have to go over to the house early to let the builder in so he can get the flooring guys to fix our floor.
I'm still waiting for the excitement to kick in. Still not feeling it. If you read this far, than you can see why.
I would have taken photos but I was just too angry.
We did our final walkthrough today at 1pm. There were a handful of tiny holes not filled or painted. Most important, the floor had a haze that we thought was just a poor cleaning job. They were going to let the floor go as it was but I put my foot down and said it had to bee fresh cleaned before we move in. Then they told us they had to fire the cleaning crew for poor work. That further backed up my request for them to get it cleaned up. Everyone agreed.
We went over to the next town to close and all went well. We were given two surveys to fill out. One for the finance company and one for the builder. We scored everything except for a portion of the builder survey where I had nothing positive to say so I left it with the statement 'Refuse' (to do survey). As we were leaving, we got a call from the sales rep who congratulated us and immediately asked about the survey. I simply told her that we only did part of the survey and left part of it blank because we were happier in some areas than others.
Once we got into town, the sales rep called to tell me that the keys to our new house have already been lost somewhere between the builder and the title company. We were told a locksmith was on the way to rekey the locks and that they could put a lockbox on the house temporarily. I said no, we are coming to the house and will wait to get our 'actual' keys because we just closed on the house.
We went to the house to see hoe the touch ups went while we are closing. They did a few and missed a few. The the bomb was dropped on us. The wood floor doesn't have a haze from a dirty rag or something. It has a haze because the sheen has been removed by a chemical agent that the dumb friggin painter used to clean up after doing a lousy job to begin with.
After the bad news was given to us, the guy from the flooring company showed up to discuss things they could try to do to resolve it. While the builder and flooring guy talked, I crawled around on the floor and found white paint speckles around all of the door ways and overspray dust in corners and many of the baseboards. I told the builder that those guys have to come back and clean everything perfect. Meanwhile, the locksmith came out and rekeyed all of the doors and we were given 4 keys. The builder told us not to use our keys until he is done working because the way the locks are set up. Our keys will void his if we use them. He was going to get an additional spec key from the sales rep but she had already gone for the day. He gave us his and said he would just go get the other one in the morning.
There wasn't more we could do but finally go get something to eat. It was eating me up all evening. I called the sales rep to tell her about the floor. The first thing she told me is that this is where she comes in and that's why we shouldn't give her a bad survey. I scolded her immediately that I never said anything about giving her a bad survey; that I only ever indicated that I graded only in the areas that we were happiest. She said that if they can't get it resolved, that it would become a poor workmanship claim and that the floor would have to be replaced if we aren't happy with the end result.
After dinner we went to finance our refrigerator but we are not happy with the limit readily available to us. So, we just decided that we will pay cash but better wait until they get the floor issue resolved. We did get some insecticide, however.
My wife and son went home and I went to the house to spray for pests, even though it was already dark. The spec key didn't work. That figures, since the locks were rekeyed. So, I have to go over to the house early to let the builder in so he can get the flooring guys to fix our floor.
I'm still waiting for the excitement to kick in. Still not feeling it. If you read this far, than you can see why.
I would have taken photos but I was just too angry.
Monday, September 28, 2015
Walkthrough
This morning we went to the house only expecting to be there for a few minutes since we hadn't seen any progress over the weekend. There seemed to be little need to do a walkthrough. But our not showing up wasn't going to an excuse for the builder to delay again, so we went.
When we got inside we could smell fresh paint. Even though the painters don't work on Sunday, someone got their rear chewed and made them pull it off last night.
So we walked the house for about 2 hours. There are about 15 items that need attention with the bulk of it being related to touch ups as a single item. Some of the other items that I can remember off of the top of my head is shrubs too close to the foundation, misadjusted window in master bedroom near the bathroom, all window tracks dusty and binding, master bath vent and switch, shower light out of socket, caulking cracks and crevices, dapping holes, evening out paint, cleaning doors, clear coat on recently stained cabinets and trim, fence gate latch adjustment, rear door weather strip, utility room trim at dryer exhaust, sticking door knob in my son's room, loose cabinet doors, sticking door at my wife's closet, grout filler in shower, and maybe some other detail I'm not remembering. They will give us a list of items checked when we do our final inspection on Wednesday.
Some of the home mechanical stuff is a bit overwhelming. I went up inside the attic for the first time.
I forgot to ask them about the mailbox but I'm sure they'll remember it.
After driving back to work, the sales rep texted me to inform us that the final walkthrough will be Wednesday at 1 PM followed by the closing meeting at 2 PM.
After work, I went to the storage unit to get my huge keyboard case, the box that out TV came in, and 2 of my wife's suitcases.
After we get the keys in our hands on Wednesday, I will call to schedule the movers FINALLY!
We plan to move the first items into the house on Friday. The date that we move anything into the house is very important to my wife.
This is what I've packed so far.
When we got inside we could smell fresh paint. Even though the painters don't work on Sunday, someone got their rear chewed and made them pull it off last night.
So we walked the house for about 2 hours. There are about 15 items that need attention with the bulk of it being related to touch ups as a single item. Some of the other items that I can remember off of the top of my head is shrubs too close to the foundation, misadjusted window in master bedroom near the bathroom, all window tracks dusty and binding, master bath vent and switch, shower light out of socket, caulking cracks and crevices, dapping holes, evening out paint, cleaning doors, clear coat on recently stained cabinets and trim, fence gate latch adjustment, rear door weather strip, utility room trim at dryer exhaust, sticking door knob in my son's room, loose cabinet doors, sticking door at my wife's closet, grout filler in shower, and maybe some other detail I'm not remembering. They will give us a list of items checked when we do our final inspection on Wednesday.
Some of the home mechanical stuff is a bit overwhelming. I went up inside the attic for the first time.
I forgot to ask them about the mailbox but I'm sure they'll remember it.
After driving back to work, the sales rep texted me to inform us that the final walkthrough will be Wednesday at 1 PM followed by the closing meeting at 2 PM.
After work, I went to the storage unit to get my huge keyboard case, the box that out TV came in, and 2 of my wife's suitcases.
After we get the keys in our hands on Wednesday, I will call to schedule the movers FINALLY!
We plan to move the first items into the house on Friday. The date that we move anything into the house is very important to my wife.
This is what I've packed so far.
Saturday, September 26, 2015
Painter No Show
We went by the house late this morning and again early this evening and again, no activity. The builder said the house would be finished before Monday. The has become more of a fantasy than an actuality. I confirmed that the no work is planned for Sunday. They don't work Sunday anyway.
This is getting so old. This is the reason it has become impossible for me to get excited about the house.
This is getting so old. This is the reason it has become impossible for me to get excited about the house.
Friday, September 25, 2015
Progress Minimal
I went to the house first thing this morning since the house was locked yesterday after work. I saw the new shower door and towel rack. There was also two ladies cleaning. The builder was also there and he said the electrician would be there soon. But I had to get to work.
After work I went back over to the house to see the finished paint and stained cabinets but the place was locked up already even at 4 PM. I looked through the windows and guess what? NO PAINT/NO STAIN. The extra cabinet has been moved to the garage. The next disappointment appears to be right on schedule.
After work I went back over to the house to see the finished paint and stained cabinets but the place was locked up already even at 4 PM. I looked through the windows and guess what? NO PAINT/NO STAIN. The extra cabinet has been moved to the garage. The next disappointment appears to be right on schedule.
Thursday, September 24, 2015
Walkthrough Checklist and Corrections
My wife and I stayed up last night and found a good checklist here for doing a thorough walkthrough inspection. In the event that the link above breaks, I am including the list below.
Exhaust pipes coming from roof are crooked.
Arch holes filled.
Missing glass shade replaced.
Missing magazine rack installed.
Weather stripping missing on all doors. Must be waiting for paint.
Power washing the garage and driveway.
T post (the first thing put on our lot) removed.
Doors
•
Open and close all doors. See that doors are well-fitted and operate as
intended.
•
Make sure all six sides are painted – front, back, top, bottom and both ends.
•
Be certain locks, including deadbolts, operate properly without binding, and
that thresholds are adjusted correctly.
•
Look for warping.
•
Hinges should be clean and free of paint.
•
Sometimes doors must be trimmed to fit. Make sure the cut is at the bottom,
that it's straight, and that so much hasn't been cut off that the door is now
hollow at the bottom.
•
Check that locks are well-installed and do not rattle when the door is closed.
•
Check that the exterior doors have been sealed with weather-stripping.
Windows
•
Open all windows.
•
Determine that locks operate properly.
•
Tracks should be lubricated to prevent binding.
•
Make sure screens are in place and not torn.
•
Look for broken panes.
Walls
•
Walk the perimeter of each room, checking floor and ceiling moldings to be sure
they are uniform.
•
Look for gaps that need caulking, protruding nail heads and proper finish.
•
Examine all wall and ceiling surfaces under natural light and, if possible, at
night under artificial illumination. Poor drywall work tends to show most when
the lights are on.
•
Look for visible seams, nail heads that have popped out and other
irregularities.
•
Be sure the walls are square. Otherwise, the tile floor or patterned vinyl
floor will be askew. In such a small space, anything that's out of line will
become a constant source of irritation.
•
Inspect the wall finishes for uneven paint coverage.
Electrical
•
Be sure all wall outlets and switches operate correctly.
•
Test light fixtures, making certain they are attached securely and contain the
correct-wattage bulbs.
•
Locate the main electrical panel and review the function of each circuit
breaker and fuse.
•
Your new home must be equipped with ground fault and arc fault circuit
interrupters (GFCI and AFCI). GFCIs protect bathroom and exterior receptacle
circuits, while AFCIs protect bedroom receptacle circuits. Ask your builder how
to test these devices.
Flooring
•
Tile and vinyl flooring should be clean and free of chips and cracks.
•
Check for missing grout, and be sure molding is installed and painted or
stained.
•
Walk all carpeted areas, checking for loose fits at the edges, ripples in the
middle and squeaks in the subfloor.
•
Walk across all floors. You should hear only a minimum of squeaks and notice a
minimum of spring when walking on the floor. Due to the nature of wood, a wood
floor system will have a certain amount of unevenness.
•
See that floor coverings have a relatively flat surface.
•
Examine seams in carpets and vinyl to ensure they are tight.
•
Inspect ceramic tiles for surface cracks. Joints between ceramic tiles should
be well-filled with grout.
•
Inspect flooring for damage.
•
Examine carpeting for stains or shade variations.
Kitchen
•
Check countertops for scratches and abrasions, a frequent complaint. Counters
are a magnet for toolboxes from every trade.
•
Also make sure the cabinets and appliances are level and properly anchored to
the wall or secured to the countertops.
•
Check all doors and drawers. They should open fully and without binding.
•
Ask for the instruction manuals for every appliance in the house – the range,
refrigerator, dishwasher, furnace, heat pump, water heater, electronic
thermostat, everything.
Bathrooms
•
Look for scratches and nicks in the sink as well as the shower enclosure and
tub. Workmen like to put their toolboxes there as well.
•
Check that the sink and tub stoppers hold water, and that the shower strainer
is fastened securely.
•
Make certain the toilet is securely fastened to the floor. Don't test the
commode by trying to rock the fixture back and forth. That will break a seal
that's correctly installed. Just sitting on it is enough to tell if it is
tight.
•
While sitting there, close the door and take a long, hard look at the walls and
other surfaces to make sure they are acceptable. Flaws show up most when
semi-gloss paint is used, and that's what bathrooms should be painted with, not
flat paint.
•
While you're at it, be sure to see if the toilet-paper dispenser is at the
right distance and height. If it isn't, you may have to be a contortionist to
reach the roll.
•
Check for chips in bathtubs, toilets and sinks.
•
Ensure that all faucets work properly.
•
Check that cabinets are securely fixed to the wall.
•
Examine caulking around tub and shower enclosures and at countertop
backsplashes.
Heating/Air-conditioning
•
Test for cold A/C.
•
Check the furnace and hot water heater.
•
Ask about the capacity, shut-off mechanisms and the type of filtering systems
installed.
•
Review the operation of your heating system.
•
Locate the furnace filters and ask about their care and maintenance.
•
Ensure that heat registers are not located below a thermostat.
•
Check the location and number of cold air returns and make sure they are
unobstructed.
•
Learn the location of any fuel lines (gas, propane or oil) and understand how
to operate any shut-off devices on these lines.
Mechanical ventilation
•
Locate the switches for ventilation and circulation fans (normally placed near
the thermostat).
•
Locate supplemental fans and switches in each bathroom and in the kitchen and
ensure they are operating. Make sure you understand how to achieve proper
ventilation in order to avoid condensation problems which may not be covered
under the warranty.
Plumbing
•
Locate the shut-off valves for the main water supply and the location of other
shut-off valves throughout your home.
Kitchen
•
Check for damage to countertops, cupboard doors, sinks and appliances.
•
Ensure that cabinet doors are properly aligned.
•
Check spaces for standard appliances unless specific measurements were given to
your builder. The space allotted for your appliances should be correct.
•
Test the range hood fan and light.
•
Make sure there are electrical outlets above the counter.
Closets
•
Make sure that doors are secure and that they open and close easily
This list was delivered to the house for the builder to let them know how thorough we are going to be.
Lunch photos:
Pantry door swing corrected.
Exhaust pipes coming from roof are crooked.
Arch holes filled.
Missing glass shade replaced.
Missing magazine rack installed.
Weather stripping missing on all doors. Must be waiting for paint.
Power washing the garage and driveway.
After work photos. Well the house was locked. About the only thing I could see was the stupid downspout going right out in the middle of the yard. What an eye sore and hazard.
T post (the first thing put on our lot) removed.
At the end of the day the house is nowhere near ready for a walkthrough. I expressed to the builder that we don't want to waste time walking through a house that isn't finished. So, it has been rescheduled for Monday.
The builder told me that the electrician will be at the house in the morning to wire the missing light in the master bath and painters would be there Friday and Saturday and final city inspection is tomorrow.