The second time out was this afternoon. They just finished putting the polyethylene down. When we were leaving, they were just starting to lay out the post tension cables.
Showing posts with label polyethylene. Show all posts
Showing posts with label polyethylene. Show all posts
Wednesday, April 15, 2015
Polyethylene Vapor/Moisture Barrier Part 2 (Finish)
I was out twice today. At lunch, more sand was added to the pads and retrenching continued.
The second time out was this afternoon. They just finished putting the polyethylene down. When we were leaving, they were just starting to lay out the post tension cables.
The second time out was this afternoon. They just finished putting the polyethylene down. When we were leaving, they were just starting to lay out the post tension cables.
Tuesday, April 14, 2015
Polyethylene Vapor/Moisture Barrier Part 1 (Start)
The pads of sand from a few days ago have been covered with polyethylene and new ares have been retrenched and covered with sand. Moving along.