Post Tension Cables

All of the post tension cables are set up. All ready for concrete but it will rain tonight.





Posted by Jerry Markham at 3:28 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My photo
Jerry Markham
View my complete profile

Blog Archive

  • ▼  2015 (123)
    • ►  October (2)
    • ►  September (21)
    • ►  August (20)
    • ►  July (17)
    • ►  June (10)
    • ►  May (17)
    • ▼  April (9)
      • Cleaning Up and Soil Leveling
      • Removal of the Slab Forms
      • Now we wait for the slab to cure
      • A Slab at Last
      • Post Tension Cables
      • Polyethylene Vapor/Moisture Barrier Part 2 (Finish)
      • Polyethylene Vapor/Moisture Barrier Part 1 (Start)
      • Retrenching and Fresh Sand
      • Post Tension Cables and Rebar Arrives
    • ►  March (8)
    • ►  February (7)
    • ►  January (12)
  • ►  2014 (17)
    • ►  December (2)
    • ►  October (4)
    • ►  September (11)
Awesome Inc. theme. Powered by Blogger.